Hongtai Huarui Technology Group welcomes your visit. We have been dedicated to the environmental protection and governance industry for over a decade! We look forward to a cooperation with you!

National Service Hotline :400-669-0860
  • Follow WeChat
  • Follow Douyin
Operation and maintenance projects of sewage treatment stations in 36 market towns in Enyang District, Bazhong
  • Release date: 2023-06-26 09:40:55
  • Author: 鸿泰华瑞
  • Reading: 3938

  • Key words: Operation and maintenance projects of sewage treatment stations in 36 market towns in Enyang District, Bazhong

Project Overview

In order to ensure the normal operation of sewage treatment stations in 36 market towns such as Liulin Town, Enyang District, Bazhong City, reduce harmful substances discharged into natural systems, and improve the ecological environment, Hongtai Huarui Technology Group provides operation and hosting services for sewage treatment stations in 36 market towns such as Liulin Town, Enyang District, Bazhong City.

处理规模

In 36 market towns (47 points in total) in Enyang District, the daily sewage treatment capacity is 50~1500m³/d, and the total sewage treatment volume of 36 market towns is about 10980m³/d

服务内容

(1) Responsible for the operation and maintenance of sewage treatment station facilities (including sewage treatment agents) in 36 market towns including Liulin Town, Enyang District, Bazhong City, to ensure the stable treatment and discharge of sewage (referring to the domestic sewage collected by the self-pipe network collection system of the sewage treatment station).

(2) Sludge disposal: The sludge substances generated in the sewage treatment process are collected and transferred from each station to a qualified sludge disposal plant according to specifications for centralized treatment.

(3) Daily testing indicators: routine testing is carried out during the operation of the project facilities, including: biochemical oxygen demand BOD5, chemical oxygen demand CODcr, suspended solids SS, ammonia nitrogen NH3-N, total phosphorus, total nitrogen, PH value, etc.

(4) Responsible for the operation, maintenance and maintenance of lifting pumping stations outside the station of 36 market towns and all main networks.

 

Project construction drawings

the overview of this text: